日本成人中文字幕-色一色成人网-67194熟妇在线观看线路-国产精品国产亚洲区艳妇糸列短篇-精品国产在天天在线观看-国产又粗又爽又黄-日本免费不卡一区在线电影-亚洲专区av-不卡中文字幕-亚洲第一av无码专区-三浦理惠子av在线播放-亚洲欧洲一区二区三区四区-天天狠天天添日日拍-久久亚洲a v-超碰在线网

ACEG Algeria Branch / Two pieces of project news
ACEG Overseas  |  Updated: 2019-05-17  |  Views: 6891
The Military Academy Project
Concrete has been poured for the foundation of the first plot
 
Through joint efforts of all the Project staff and the cooperation and supports from the Owner and the Engineer and the Supervision Bureau of Quality of Algeria, the concrete pouring work for the foundation of the first plot of the Project has been completed satisfactorily at 3 am on May 1 local time.
 
The work started at 1 pm on April 30 and a total volume of 483 cu.m. concrete has been poured. The Project has overcome various difficulties and adverse conditions and completed the work with careful layout and strict management and reasonable arrangement and two shifts in turn have been implemented for all the processes of the concrete pouring and the technical director, together with the foremen have made fine technical clarifications and clear foundation concrete pouring method details to ensure that the concrete strength, concrete curing and crack control measures matching the requirements.
 
 
 
 
 
Ain Defla Spa Hotel Project
Concrete pouring work for the foundation beds finished
 
May 13 morning local time, the Project of Ain Defla Spa Hotel has completed the concrete pouring work for the foundation beds marked No.15 up to No. 17.
 
The Hotel is located in a remote desert hinterland; the climate there is hot with sandstorms. In order to guarantee the construction quality and speed up the construction progresses, the staff with the Project have managed to make the concrete pouring at the time when it is less hot, the project managers have joined the working teams because short of hands at the site and the orderly pouring processes were ensured.